Dulux
Accredited
No # 1
Painter in Sydney
Get A Quote
ClientPittwater Road, Collaroy
ProjectExteriors & Interiors
Duration8 months (including 12 staging phases)

Collaroy, Strata Painting

3 Colours Painting Services was engaged by the Owners Corporation of The Bellagio, a prestigious waterfront apartment complex in Collaroy, to undertake comprehensive remedial facade work and interior painting. This beachfront property showcased 3 Colours’ expertise in managing complex, large-scale coastal projects.

Scope of Work

Exterior

Fascia boards, eaves, walls, balcony slabs and soffits, carpark and bin room entrances, complete silicone beading replacement on glass balustrades, crack repairs, render restoration, and moisture management.

Interior

Common area hallways, staircases, garage, pool and gym facilities including ceilings, cornices, walls, doors, frames, skirting boards, dado rails, and metal railings.

Project Complexity

Coastal Environment

Direct beachfront exposure to salt spray, high winds, and intense UV required specialist coating systems and extensive surface preparation.

Multi-Level Access

Working across three levels of an occupied building required 12 staging phases: 9 scaffolding stages, 2 ladder stages, and 1 cherry picker stage, with scaffolding moved up to eight times.

Occupied Building

Comprehensive protection protocols and coordinated scheduling minimized disruption to residents throughout the 8-month project.

Advanced Coating Systems

  • Murobond Silicate Primer & Paint on ocean-facing balconies—highly vapour-permeable for superior coastal weather resistance
  • Dulux AcraShield Elastomeric 201 on exterior masonry—elastic crack-bridging properties ideal for coastal conditions
  • Dulux WeatherShield on soffits for maximum protection
  • Sikaflex professional-grade sealant at all junctions
  • Westox mortar systems for structural crack repairs

Professional Techniques

Industry-leading remedial methods including proper crack repair protocols, multi-stage surface treatments, and comprehensive waterproofing integration.

Project Management

  • Weekly coordination meetings with strata representatives
  • Progressive staging maintaining resident amenity
  • Fixed scaffolding costs for budget certainty
  • 300+ progress images for transparency and quality assurance